STG Heating Pvt. Ltd. specializes in the design, supply and installation of lightning protection system, earthing system and surge protection devices in association with leading international brand FURSE. Lightning protection system is designed to IS/IEC regulations and each product contain test certifications to prove its ability to protect its consumers at all times.
A reliable lightning protection system must encompass external (structural) lightning protection, effective earthing and transient overvoltage protection (surge protection of electronic system).
That’s why we advocate a Total Solution to earthing & lightning protection.
Our Total Solution delivers the most complete and effective protection against lightning risk, safeguarding life whilst ensuring continuous, normal operation of critical electronic systems.
This approach of lightning protection is now fully endorsed by the IS/IEC 62305 Standard.
STG Heating Pvt. Ltd. provides the following systems and services:
1. Lightning protection system
– Team of experienced engineers
– Engineered designs to meet client specifications
– Risk assessment complying with latest standards
2. Soil resistivity surveys
– Experienced surveyors
– Key to creating effective earthing system – Multiple readings taken to ensure safe and accurate designs
3. Earthing design
– Detailed design to meet the desired resistance to earth value in line with the standards
4. Testing & Certification
– Verification of earthing design through measurement
– Experienced team of engineers with full understanding of electrode testing
Compliance, now & in the future
Furse designs comply with all recognized standards.
– IS/IEC 62305 Protection against lightning
– NFPA 780 Standard for the installation of lightning protection systems
– IEEE Std 80:2000 IEEE Guide for safety in AC substation grounding
– BS7430:2011 Earthing of Electrical installation
– ENA TS 41-24 Guidelines for the design, installation, testing & maintenance of main earthing systems in substations.
– BS EN 50522:2010 - Earthing of power installations exceeding 1.k Vac
– S34 – Assessment of the rise of earth potential at substation site